Thursday, 28 October 2021

Tima 14 And Room 15 New class room

 :Monday 19th August, 2021






Today we took a look at the relocatable classes and saw how they were doing. There were wires sticking out of walls without outer panels so there was probably stuff they needed to add. The first few days they were taking water out of a hole because the pipe that got water for the taps for our school was hit and water flooded the hole which got water seeping into soil which probably made more problems.

This was a piece of dairy thing we are doing because Room 15 and Tima 14 are going to move into a relocatable classroom and this classroom will be SMASHED.

No comments:

Post a Comment